Every time a save changed this bid's bottom number. Newest first.
When
Who
From
To
Change
No total changes recorded yet. (History starts with the first save made after this feature was added.)
Saved versions
A snapshot is kept every time the total changes (and every couple of minutes while editing). Restore puts that version back; the current one is kept too.
Saved
By
Lines
Total
No saved versions yet. The first one is written on the next save.
My Bids
Click a bid to open it. Auto-saved changes never overwrite a different bid.
Project
Client
Modified
Total
No saved bids yet. The bid you're working on is auto-saved here as soon as you give it a project name.
Proposal
2901 Ridgelake Drive, Suite 207
Metairie, LA 70002
Project Information
Scope of Work
Takeoff Inputs — internal only, hidden from PDF
Enter quantity × unit price for the categories below. The computed total auto-populates the matching line item in the Cost Breakdown.
#
Category
Qty
Unit
$ / Unit
Line Total
Cost Breakdown
#
Category
Description / Subcontractor
Amount
Subtotal
$0.00
Overhead %
$0.00
New Subtotal
$0.00
Profit %
$0.00
Total
$0.00
Per SF internal SF
—
Percentages are hidden on the printed proposal — the client sees only the dollar amounts.
Alternates
Default markup for new alternates internal:
overhead %
· profit %
Amount
In total
Base Total
$0
+ Alternates in total
$0
Base + Alternates
$0
Per SF internal
—
Internal only — not printed. Each alternate has its own cost, OH % and P %; click → Amt to set the amount from them (then change it by hand if you want). Switch "In total" on to add an alternate to the Base + Alternates total.
Exclusions
Acceptance
Acceptance of this proposal indicates agreement with the scope, total price, and exclusions stated above. Signed copies should be returned to Keta Construction Company
Accepted By (Client)
Signature
Printed Name / Title
Date
Submitted By (Keta Construction)
Signature
Printed Name / Title
Date
Item Library
Reusable materials · shared across every bid and every device
Item Name
Unit
Unit Cost
Notes / Supplier
Items appear in the Material dropdown when editing this category's detail lines.
0 items
Category Detail
Line-item breakdown · feeds material order
Material / Description
Qty
Unit
Unit Cost
Total
Sum flows into the category's Amount on the bid sheet.