Keta Bid

Up to date
Proposal
2901 Ridgelake Drive, Suite 207
Metairie, LA 70002
Project Information
Scope of Work
Cost Breakdown
# Category Description / Subcontractor Amount
Subtotal $0.00
Overhead % $0.00
New Subtotal $0.00
Profit % $0.00
Total $0.00
Per SF internal SF —
Percentages are hidden on the printed proposal — the client sees only the dollar amounts.
Alternates
Default markup for new alternates internal: overhead %  ·  profit %
AmountIn total
Base Total $0
+ Alternates in total $0
Base + Alternates $0
Per SF internal —
Internal only — not printed. Each alternate has its own cost, OH % and P %; click → Amt to set the amount from them (then change it by hand if you want). Switch "In total" on to add an alternate to the Base + Alternates total.
Exclusions
Acceptance

Acceptance of this proposal indicates agreement with the scope, total price, and exclusions stated above. Signed copies should be returned to Keta Construction Company

Accepted By (Client)
 
Signature
Printed Name / Title
Date
Submitted By (Keta Construction)
 
Signature
Printed Name / Title
Date
Item Library
Reusable materials · shared across every bid and every device
Item Name Unit Unit Cost Notes / Supplier
Items appear in the Material dropdown when editing this category's detail lines.
0 items
Category Detail
Line-item breakdown · feeds material order
Material / Description Qty Unit Unit Cost Total
Sum flows into the category's Amount on the bid sheet.
Category total: $0.00